Citrus Isle, Citrus Pointe, Citrus Landing, and Citrus Reserve
-
CLIENT Cassidy Land Development
-
PROJECT COST $10M Construction Cost
-
LOCATION Davenport, FL | Polk County | Holly Hill CDD
-
628
Lots
-
145
Acres
PROJECT STATS
-
COMPLETION DATE
2021
-
PROJECT DURATION
3 Years
-
Location
Davenport, FL | Polk County | Holly Hill CDD
-
SERVICES
Construction Engineering and Inspection
Engineering Design & Permitting
Hydrology and Hydraulics
Platting & Entitlements
Sanitary Sewer Collection System
Single Family Developments
Site Civil Services
Site Planning
PROJECT OVERVIEW
A Unified PUD for a Connected, Walkable Master-Planned District
A single Planned Unit Development (PUD) allowed Citrus Isle, Citrus Pointe, Citrus Landing, and Citrus Reserve to be planned as one 628-lot community across 145 acres in Polk County’s City of Davenport. Instead of designing each neighborhood on its own, the PUD made it possible to lay out the streets, open space, and pedestrian connections for all four at once. Built over four phases, the neighborhoods are linked by a walking trail system and share a central amenity center in Citrus Pointe, giving residents throughout the development access to the same amenities within a single, walkable community. The amenity center features a pool, pavilion, playground, multi-purpose field, and parking.
Development Breakdown
Citrus Isle | Phase 1 | 44.47 acres | 204 lots
Citrus Pointe | Phase 2 | 24 acres | 100 lots
Citrus Landing | Phase 3 | 42.73 acres | 182 lots
Citrus Reserve | Phase 4 | 33.78 acres | 142 lots
Agencies & Jurisdictions
- City of Davenport
- Polk County
- Polk County School Board
- Holly Hill Road East Community Development District (CDD)
- Haines City Utility Review
- Southwest Florida Water Management District (SWFWMD)
- Florida Department of Environmental Protection (FDEP)
Notable Homebuilders: Lennar, Meritage Homes, Centex Homes, Adams Homes
SERVICE DETAILS
Entitlement & Permitting
Quiddity managed rezoning to PUD, site development plans, and platting through the City of Davenport, along with a full suite of permitting and supporting designs.
Permitting And Calculations Included:
- Polk County Driveway Permit
- Haines City Utility Review
- Southwest Florida Water Management District (SWFWMD) Drainage Permit
- Polk County School Board Concurrency Approval
- Florida Department Of Environmental Protection (FDEP) Water & Sewer Permits
- Drainage And Lift Station Calculations
- Traffic Study
Public Infrastructure
Public infrastructure for the District’s Capital Improvement Plan included:
- Stormwater Management Facilities (Uses Dry Retention For Water Quality Treatment)
- Public Roadways Built To An Urban Typical Section
- Looped Potable Water System Providing Domestic & Fire Protection Service
- Wastewater Collection System Of Gravity Sanitary Sewer Mains & Lift Stations
District Engineering
Quiddity Also assisted with the establishment of Holly Hill Road East Community Development District (CDD), which governs these four communities, and served as the District Engineer for four years, guiding capital improvements, permitting, and infrastructure delivery across all four phases. As District Engineer, Quiddity prepared the CDD’s Engineers Report, outlining the capital improvement plan, probable costs, and infrastructure ownership and maintenance responsibilities for the district’s public facilities.
Amenities & Community Connectivity
A defining feature of the project was full civil design of the shared amenity center, along with pedestrian crosswalk improvements along Holly Hill Road, including rectangular rapid flash beacon (RRFB) crossings. Our engineers also designed a connected walking trail system, uncommon for projects of this scale, linking Citrus Isle, Citrus Pointe, Citrus Reserve, and Citrus Landing to one another, to a public park built adjacent to Holly Hill Road, and to the surrounding District. The connectivity provided by the trail system transformed the developments into a walkable integrated community.