Jones Carter Logo
  • Who We Are
    • Building Community
    • Leadership Team
    • Our Team Members
  • Services
    • Construction Management & Inspection
    • Electrical, Instrumentation, and SCADA Development
    • Environmental
    • Hydrology & Hydraulics
    • Permitting
    • Planning + Landscape Architecture
    • Program Management
    • Single-Family Developments
    • Site Civil Services
    • Structural
    • Surveying
    • Traffic
    • Transportation
    • Wastewater Collection and Treatment
    • Water District Services
    • Water Distribution and Treatment
  • Markets
    • Aviation
    • Cities
    • Counties
    • Districts & Authorities
    • Drainage
    • Healthcare
    • Hospitality
    • Industrial
    • Master Planned Communities
    • Mixed-Use Development
    • Multi-Family Residential
    • Offices & Corporate Spaces
    • Ports
    • Retail
    • State Agencies
    • Telecommunications
    • Transportation
    • Water & Wastewater
  • Projects
  • Build Your Career
    • Why Choose Quiddity?
    • Early Career Opportunities
    • Experienced Professional Opportunities
    • Internship Program
  • Industry Insights
  • Contact Us

WWTP No. 1 Rehabilitation and New WWTP No. 2

  • CLIENT Fort Bend County WC&ID No. 2

  • PROJECT COST WWTP 1 $15.6M | WWTP 2 $40.7M

  • LOCATION Stafford, TX

PROJECT STATS

  • COMPLETION DATE

    2024

  • Location

    Stafford, TX

  • SERVICES

    Wastewater Treatment

PROJECT OVERVIEW

Beginning in 2022, Quiddity designed a rehabilitation of 6 MGD WWTP 1 (constructed in multiple packages), with the final package set to start construction in 2024. The WWTP 1 rehab included: Rehab of existing headworks including 2-12 MGD mechanical screens; Conversion of 0.7 MGD secondary treatment train to activated sludge including decommissioning existing RBCs; Replacement of fine bubble aeration systems, 9 multi-stage centrifugal blowers, 2-86' diameter Primary clarifier mechanisms, sludge holding tanks, dewatering system (including 2 new belt presses and multiconveyor), air lift sludge conveyance, MCCs throughout the site; and radio communication system with single mode fiber communication network; Conversion of 2 secondary clarifiers and replacement of mechanisms (60' & 80' dia); Modifications to existing lime stabilization sludge treatment system to downgrade treatment from Class A to Class B.
 
The new WWTP 2 constructed in 2023 included: Activated sludge train, aerobic digesters, gravity thickeners, rotary press sludge dewatering building, NPW pumps, blowers, a detention pond, and expansion of the existing lift station. In addition to the mechanical equipment, process equipment, piping, site development, electrical power and communication infrastructure, the WWTP 2 project included a new operations building designed to serve as an emergency operations center for the District during extreme events.
Engineers. Planners. Surveyors.

Over 50 years of innovative projects
and unmatched expertise.
Build Your Career Build Your Project
  • Austin
  • College Station
  • Dallas
  • Fort Worth
  • Houston
  • Katy
  • Lakeland
  • New Braunfels
  • Plano
  • Round Rock
  • San Antonio
  • Tampa
  • The Woodlands
  • Waco
  • Connect with Us

© 2026 Quiddity

  • Privacy Policy
  • Terms of Use