Phase I Sanitary Sewer Rehabilitation (Cured-in-Place-Piping)
CLIENT Kleinwood MUD
PROJECT COST .43M (Construction)
LOCATION Spring, TX
PROJECT STATS
COMPLETION DATE
July 2021
Location
Spring, TX
SERVICES
Sanitary Sewer Collection System
24" & 30" CIPP
1,500 LF
500 VF
Manhole Grout & Epoxy
10
trunkline point repairs
PROJECT OVERVIEW
Following a district-wide cleaning and televising project of the district’s sanitary sewer collection system and recommendations from Quiddity’s review of the assessment, the District proceeded with a multi-phase rehabilitation project to repair broken sewer leads, deteriorated manholes, and deteriorated large diameter reinforced concrete pipe. The rehabilitation included cured-in-place piping (CIPP) for trenchless rehabilitation along with cementitious grouting and epoxy of the brick and concrete manholes. Our team provided design, bidding, and construction oversight for the project.
SERVICE DETAILS
Quiddity provided project planning and cost estimation, bond application funding, design, bidding, construction contract administration, and field project representation.